“The view from our standpoint is that this project has been one of the most successful nourishment projects that have been done, as far as the beaches retaining the sand,” said Jeff Lignelli, who spearheaded the organization of the Bridgehampton-Water Mill Erosion Control District. “What I’m proud of is how the residents of the town worked together to do the right thing. The beaches are dramatically wider for everyone who wants to use them.”

Read the article from the Southampton Press.